Customization: | Available |
---|---|
Condition: | New |
Speed: | High Speed |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Preparation and Precaution of installing
(1)Preparation of installing
1. Choose a flat ground to ensure that the machine level
2. Choose firm placement platform to ensure that the machine can not move.
3. Enough space for production operations.
4. Avoid hot and humid environment.
5. Check the power cable if there is breakage.
(2)Precaution for use
1. Electrical Considerations
Use a multimeter to check if the power supply voltage is correct and the connection is reliable.
Ensure that it is earth grounded safely.
Ensure that all hardware connections are secure.
2. Safety Precautions
Before moving the machine, turn the power off, unplug the power cord.
Pay attention to personal safety when transport.
Ensure there is no foreign matter inside of machine before electrifying.
Before electrifying, manual confirmation of the agencies operating normally, without hindrance.
Press the red emergency stop switch, and the system power supply is disconnected when there is emergency.
Installation of mounter
(1)Select the appropriate operating space for placing Mounter
(2)The SMT machine should be placed in a special support frame.
(3)The machine power should be accessed on the labeled INPUT socket.
==================== Other Notice ====================
Payment:
* We accept T/T, paypal, etc
Shipping:
· We will use FedEx/DHL/UPS/TNT/EMS for fast and safe shipping. We will use the most convenient one when you buy the product.
· Before shipping, we will pack every product well for you. And please check the outside package when you receive the parcel well
· If you have special requirement for shipping, please let us know in advance.
Warranty :
· We provide 12 months Warranty for our products!
·